Showing:

Diagrams
Facets
Source
Simple Type diggs:AnalysisApproachEnumType
Namespace http://diggsml.org/schemas/3
Diagram
Diagram
Type restriction of string
Facets
enumeration analytical method
The design was calculated using a published closed-form or semi-analytical
method - for example the FHWA beam or strain-compatibility methods, BS
8006-1, EBGEO, CUR226 or the Nordic method - recorded in the design's
designMethod.
enumeration numerical analysis
The design was calculated using a numerical method, most commonly
finite-element or finite-difference analysis, rather than a published
closed-form analytical method.
enumeration personal experience
The design was set by engineering judgment or precedent rather than an
explicit analytical or numerical calculation.
enumeration load testing
The design basis was established or verified by pre-production or proof load
testing rather than by calculation alone.
Source
<simpleType name="AnalysisApproachEnumType">
  <restriction base="string">
    <enumeration value="analytical method">
      <annotation>
        <documentation>The design was calculated using a published closed-form or semi-analytical method - for example the FHWA beam or strain-compatibility methods, BS 8006-1, EBGEO, CUR226 or the Nordic method - recorded in the design's designMethod.</documentation>
      </annotation>
    </enumeration>
    <enumeration value="numerical analysis">
      <annotation>
        <documentation>The design was calculated using a numerical method, most commonly finite-element or finite-difference analysis, rather than a published closed-form analytical method.</documentation>
      </annotation>
    </enumeration>
    <enumeration value="personal experience">
      <annotation>
        <documentation>The design was set by engineering judgment or precedent rather than an explicit analytical or numerical calculation.</documentation>
      </annotation>
    </enumeration>
    <enumeration value="load testing">
      <annotation>
        <documentation>The design basis was established or verified by pre-production or proof load testing rather than by calculation alone.</documentation>
      </annotation>
    </enumeration>
  </restriction>
</simpleType>